I just completed a major refurbishing of the boat and trailer.
All new running rigging, some new hardware, all rivets/screws replaced as needed, all wood refinished with 8 coats Cetol, main sail sent to SailCare for cleaning, second reef points, converted to loose foot, auto-release for rudder downhaul, gudgeons thru-bolted, Interlux barrier coat 2000E on bottom, centerboard and lower rudder, bailer sumps epoxied and new gaskets, hull compounded/waxed inside and out.
New anchor locker cover and mast crutch with roller.
New tires, wheel bearings, buddy bearings, rollers, bow stop, winch and strap installed. Standing rigging in excellent condition.